The production sequence
At Southern Hunters the documented sequence runs from aluminium slug to finished tube:
- Aluminium slug
- Impact extrusion
- Annealing
- Internal coating
- Printing/decoration
- Latex lining where required
- Capping
- Packing
What each stage does
Impact extrusion forms the slug into the tube configuration. Annealing makes the aluminium sufficiently malleable. Internal lacquer acts as a barrier between the contents and the aluminium. Dry-offset printing applies up to four separate colours over the base coat. A narrow strip of latex can be applied internally where additional protection is needed at the folded end. Tubes are then capped and packed according to the agreed requirements.
Southern Hunters also maintains an in-house tool room and an in-house graphics design department to support production and artwork requirements.